TC5WEZ
UV/HF Series | THERMOLAST® K
Applications with long flow paths and requirements for UV resistance; low density; adhesion to PP
Processing Method:
Injection Molding
Injection Molding
Color / RAL DESIGN:
black
black
Availability:
Globally
Globally
Manufacturing Site :
Germany, Malaysia, United States
Germany, Malaysia, United States
Typical applications
- Roof racks
- Window encapsulations
- Water deflectors
- Cowls gaskets
- Door sills
- A/B/C/D cappings and covers
- Corner Molding
- 2-component seals for doors
Material advantages
- Weather resistant, suitable for automotive exterior
- Optimized flow properties
- Surface mapping
- Adhesion to PP
- In-process recycling possible
- Low density
- Low mold cavity pressure
Regulations / Approvals
- DIN 75201-B - Fogging
- VDA 270 B3 - Odor
- 49 CFR §571.302 (FMVSS 302)
- PV 3930 Florida (1 year)
- PV 3930 Florida (2 years)
- PV 3929 Kalahari (1 year)
- PV 3929 Kalahari (2 years)
- Outdoor Weathering Florida 24 month SAE J1976
- Outdoor Weathering Arizona 24 month SAE J1976
- VW 50123
- BMW GS 93042
- Mercedes-Benz DBL 5562
Value | Unit | Standard | |
---|---|---|---|
Hardness | 52 | Shore A | DIN ISO 48-4 |
Density | 0.930 | g/cm3 | DIN EN ISO 1183-1 |
Tensile Strength1 | 7.0 | MPa | DIN 53504/ISO 37 |
Elongation at Break1 | 800 | % | DIN 53504/ISO 37 |
Tear Resistance | 13.0 | N/mm | ISO 34-1 Method B (b) (Graves) |
Flow Spiral [760 bar, 200 °C] | 100.0 | cm | DSOP Lab 2032 |
1Deviating from ISO 37 standard test piece S2 is tested with a traverse speed of 200 mm/min.
All values published in this data sheet are rounded average values. |
The shelf life of the TPE granules is 24 months from delivery if storage instructions are observed and the product is stored in the unopened original KRAIBURG TPE packaging. Store in dry conditions at room temperature (below 40 °C) away from heat sources and direct sunlight! Contact with nitrogen oxides must be avoided during storage! |
For further information and individual custom solutions please contact our customer service. |
Processing Guideline Injection Molding | |
---|---|
Cylinder Temperature | 180 - 200 - 220 °C, max. 250 °C (360 - 390 - 430 °F, max. 480 °F) |
Hotrunner | Hot runner temperatures: 200 -250 °C (390 - 480 °F). The runner should be empty after a maximum of 2 - 3 shots. |
Injection Pressure | 200 - 1000 bar (2900 - 14504 psi) (depending on the size and weight of the part). |
Injection Rate | In general, the fill time should not be more than 1–2 seconds. |
Hold Pressure | We recommend to derive the optimum hold pressure from determining the solidification point, starting with 40 % - 60 % of the required injection pressure. |
Back Pressure | 20 - 100 bar; if color batches are used, higher back pressure is necessary. |
Screw Retraction | If an open nozzle is used processing with screw retraction is advisable. |
Mold Temperature | 25 - 40 °C (77 - 104 °F) |
Predrying | Pre drying of the material is not necessary; if surface moisture forms as a result of changes in temperature, the material should be dried for 2 - 4 hours at 60 - 80 °C (140 - 175 °F). |
Needle Valve | With materials < 50 Shore A the use of a needle valve is advisable. |
Screw Geometry | Standard 3-zone polyolefine screw. |
Residence Time | The residence time is to be set as short as possible with a maximum of 10 minutes. |
Cleaning Recommendation | For cleaning and purging of the machine it is appropriate to use polypropylene or polyethylene. Machine must be PVC-free. |