TL6OWG-BLCK
LW/UV Series | THERMOLAST® K
Lightweight Applications requiring high UV resistance
Processing Method:
Injection Molding, Extrusion
Color / RAL DESIGN:
black
Typical applications
- Automotive Exterior
- Water deflectors
- Roof racks
- Function and design elements
- Bumpers
- Edge guards
- Heavy-walled parts
- Cowls gaskets
Material advantages
- Low density
- Adhesion to PP
- UV and weathering resistance
- Non-sticky surface
- In-process recycling possible
- Low shrinkage properties
- Low tendency to warpage
Regulations / Approvals
- 49 CFR §571.302 (FMVSS 302)
- PV 3930 Florida (1 year)
- PV 3930 Florida (2 years)
- PV 3929 Kalahari (1 year)
- PV 3929 Kalahari (2 years)
- Outdoor Weathering Florida 12 month SAE J1976
- Outdoor Weathering Florida 24 month SAE J1976
- Outdoor Weathering Arizona 12 month SAE J1976
- Outdoor Weathering Arizona 24 month SAE J1976
- Mercedes-Benz DBL 5562
Value | Unit | Standard | |
---|---|---|---|
Hardness | 60 | Shore A | DIN ISO 48-4 |
Density | 0.725 | g/cm3 | DIN EN ISO 1183-1 |
Tensile Strength1 | 2.7 | MPa | DIN 53504/ISO 37 |
Elongation at Break1 | 250 | % | DIN 53504/ISO 37 |
Tear Resistance | 10.5 | N/mm | ISO 34-1 Method B (b) (Graves) |
CS 72 h/23 °C | 14 | % | DIN ISO 815-1 Method A |
CS 24 h/70 °C | 24 | % | DIN ISO 815-1 Method A |
Flow Spiral [760 bar, 200 °C] | 63 | cm | DSOP Lab 2032 |
1Deviating from ISO 37 standard test piece S2 is tested with a traverse speed of 200 mm/min.
All values published in this data sheet are rounded average values. |
The shelf life of the TPE granules is 24 months from delivery if storage instructions are observed and the product is stored in the unopened original KRAIBURG TPE packaging. Store in dry conditions at room temperature (below 40 °C) away from heat sources and direct sunlight! Contact with nitrogen oxides must be avoided during storage! |
For further information and individual custom solutions please contact our customer service. |
Processing Guideline Injection Molding | |
---|---|
Cylinder Temperature | 180 - 200 - 220 °C, max. 250 °C (360 - 390 - 430 °F, max. 480 °F) |
Hotrunner | Hot runner temperatures: 200 -250 °C (390 - 480 °F). The runner should be empty after a maximum of 2 - 3 shots. |
Injection Pressure | 200 - 1000 bar (2900 - 14504 psi) (depending on the size and weight of the part). |
Injection Rate | In general, the fill time should not be more than 1–2 seconds. |
Hold Pressure | We recommend to derive the optimum hold pressure from determining the solidification point, starting with 40 % - 60 % of the required injection pressure. |
Back Pressure | 20 - 100 bar; if color batches are used, higher back pressure is necessary. |
Screw Retraction | If an open nozzle is used processing with screw retraction is advisable. |
Mold Temperature | The mold temperature depends on the hard component. A temperature exceeding 80 °C (175 °F) should be avoided. The common temperature is 40 - 60 °C (105 - 140° F). |
Predrying | Residual moisture content might lead to processing problems and a reduction in the quality of the finished part. The use of a desiccant dehumidifying dryer is recommended. Drying conditions: 80 °C for 2-4 hrs; maximum dew point of the inlet air: -25 °C. The maximum residual moisture of the material should not exceed 0 ,02%. |
Needle Valve | With materials < 50 Shore A the use of a needle valve is advisable. |
Screw Geometry | Standard 3-zone polyolefine screw. |
Residence Time | The residence time is to be set as short as possible with a maximum of 10 minutes. |
Cleaning Recommendation | For cleaning and purging of the machine it is appropriate to use polypropylene or polyethylene. Machine must be PVC-free. |
Processing Guideline Extrusion | |
---|---|
Cylinder Temperature | 160 - 190 - 220 °C, max. 230 °C (320 - 370 - 425 °F, max. 450 °F) |
Screw Geometry | Standard three-zone screw (e.g. polyolefin screw). The screw must be able to provide sufficient shearing. |
L/D Ratio | At least 25 |
Compression Ratio | At least 2,7 ... 3,5 : 1 |
Screens / Breaker Plate | A breaker plate and a screen pack are recommended in the extruder configuration in order to increase pressure. In minimum two screen packs of 100 mesh are recommended. |
Die Land | <= 3 mm ( <= 0,12 in.) |
Extruder Head | Ca. 190 - 210 °C (374 - 410 °F) |
Die Temperature | Ca. 180 - 190 °C (374 - 410 °F) |
Predrying | Drying of the material for at least four hours at 80°C (175°F) is recommended. The moisture level of material has to be below 0.02 %. To avoid porosity in the profile a pre drying is recommended for wall thickness > 3mm. |
Calibration | Generally not necessary; support elements may be required when extruding THERMOLAST® compounds with high hardness or when coextruding with standard thermoplastics. |
Cleaning Recommendation | For cleaning and purging of the machine it is appropriate to use polypropylene or polyethylene. Machine must be PVC-free. |